  • 膜结构张拉蓬的骨架怎么样保养
  • 本站编辑:杭州勇联装饰工程有限公司发布日期:2019-11-13 19:53 浏览次数:
停车棚搭建就是为了方便大家停车,并且许多地方都是有着公用停车棚,为此在搭建停车棚的时候应该细致哪些事项,今日就来为大家分享一下相干方面常识。
 
  1、一样平常停车棚在施工时,施工的警示标志要做好,施工现场应在伤害地段设置显明的警示标志和护栏。
 
  2、施工期间必须要用到电,那么电动工具必须使用漏电断路器,细致每台电动工具必须一台一闸。
 
  3、每一个施工场所都必须保障工作场所的道路通顺,伤害部位必须设置显明标志。
 
  4、高空作业必不可少,所以登高用的梯子必须牢固,梯子与地面的高度一样平常以60度~70度为宜。
 
  5、因为安装的伤害性较高百度快照排名,吊装所用的钢丝绳,事先必须认真的检查,外观磨损,腐蚀达钢丝绳直径的I0%时,不准使用。
 
  6、使用起重机工作时,其起重臂、钢丝绳、重物等,严禁碰触高压架空电线,与架空电线保持肯定的安全距离。需要时对高压供电线路采取防护措施。
 
  7、电具有极大的危害性,施工人员在装拆焊接设备与电力网连接部分时,必须切断电源。
 
  8、为了防止弧光辐射焊工必须裁防护面罩(内镶滤光玻璃)。在公众场所焊接,须装配运动挡光屏。
 
  9、焊接工作场所应该有优秀的透风、排气装配,有优秀的照明。
 
  10、焊接工作场所四周5m以内不得存在有易燃、易爆物品。焊工高空作业时要戴安全带,随身工具及焊条均应放在专门皮袋中。
 
  11、在危、重、险工序施工前,施工负责人必须对施工人员做专题,安全交底。分部(分项)施工前制订安全技术措施。
 
  12、起吊材料等要有专人同一指挥,重物下方严禁站人,材料肯定要拴好系牢

In many cases, parking sheds are built to facilitate parking, and many places have public parking sheds. For this reason, what should be carefully done when building parking sheds Today, small editor to share the relevant aspects of common sense. 1, as usual parking shed in the construction, construction warning signs to do a good job, the construction site should be placed in the injury zone obvious warning signs and guardrail. 2. Power must be used during construction, then power tools must be residual-current device, and each power tool must have a gate. 3. Every construction site must ensure smooth roads in the workplace and clear signs must be set up at the site of injury. 4, high-altitude work is essential, so the ladder must be strong, ladder and the height of the ground as usual to 60 ~ 70 degrees appropriate. 5, because the installation of high damage baidu snapshot ranking, lifting the use of wire rope, must be carefully checked in advance, appearance wear, corrosion up to I0% of the wire rope diameter, not allowed to use. 6, the use of crane work, its boom, wire rope, heavy objects, etc. , not to touch the high-voltage overhead power lines, and overhead power lines to maintain a certain safe distance. Take Protective Measures for high-voltage power supply line when necessary. 7, electricity has great harm, the construction personnel in the assembly and disassembly welding equipment and power network connection part, must cut off the power. 8. In order to prevent arc radiation welder must cut protective mask with filter glass. For Welding in public places, a movable light shield shall be installed. 9. The welding work place should have excellent ventilation, exhaust assembly, and excellent lighting. 10. No inflammable or explosive materials shall be found within 5 meters around the welding work place. Welders should wear safety belts when working at height, carry-on tools and electrodes should be placed in a special leather bag. 11, in the dangerous, heavy, dangerous procedures before construction, the construction of the person in charge of the construction personnel to do the topic, the safety of the account. To formulate safety technical measures before construction of subdivisions and subdivisions. 12, lifting materials and so on to have the same command, heavy objects under the station is strictly prohibited, materials must be tied fast.